LOCATION: HOME>>PRODUCTS>>Industrial Heating/Cooling Water Unit>>Scroll Chiller

TCU (Temp control unit)

  • Description: 以全封闭柔性涡旋压缩机为核心,风冷翅片冷凝器直接空气散热,集水泵、水箱于一体的室外防雨型机组,产出-120℃至+180℃的冷冻水(液)供给末端空调或设备,就是市场最常见的风冷一体式冷水机组,属于小型、安装最简单的冷水设备,也可以当作模块机组实现多台并联。
  • Features
  • Parameters
  • Fields
  • Precautions

Precautions for Unit Use


Installation precautions


1. When lifting, positioning, and installing the unit, safety must be taken into account to prevent collisions and ensure the integrity of the equipment.

2. If the unit is installed outdoors, efforts should be made to avoid exposure to wind and rain (except for rainproof types), direct sunlight, or other heat sources that directly radiate; The computer room environment must be kept dry, clean, and ensure good ventilation, leaving space for unit maintenance and upkeep.

3. For air-cooled units, please ensure that there are no obstructions around the unit and reserve 1 meter of space; There is no obstruction within 2 meters of the top of the unit to ensure good ventilation.

4. It is recommended to install the unit on a strong and level ground, and install shock-absorbing rubber pads under the unit chassis to correct the level of the unit. If there are anchor bolts, they must be installed and fixed.

5. The circulating water pump used in conjunction with the unit should be selected and installed according to the data requirements such as water flow rate and water resistance required by the unit.

6. The water pump must be installed in front of the inlet of the unit, and it is recommended to install a filter at the inlet of the water pump to prevent foreign objects from entering the heat exchanger of the unit; If the unit is installed in areas with poor water quality, water treatment must be carried out first to avoid damage to the heat exchanger.  

7. It is recommended to install valves, water pressure gauges, thermometers, water flow switches, and other equipment for the water pipeline system connecting the unit, in order to facilitate the inspection and maintenance of the unit's daily operation.

8. To prevent air from being trapped in the water system, the air must be completely discharged before starting the compressor.

9. The chilled water pipeline must be insulated properly to avoid loss of cooling capacity, condensation, and freezing.

10. The weight of the system connection pipeline shall not be borne by the machine body. Rubber shock-absorbing flexible joints and gate valves shall be installed at the inlet and outlet of the unit to avoid vibration and facilitate maintenance.

11.When configuring wires for the unit, wires with slightly larger cross-sections (with margin) should be selected according to the power consumption, and reliable electronic control components and grounding power sources should be installed to prevent accidents such as overload and leakage.

12. As the unit is equipped with reverse phase and phase loss protection, attention must be paid to whether the line phase is correct during wiring installation. The unit cannot operate normally when the phase is misconnected or missing.    

13. The operator of the unit must observe the operation status of the unit at all times. Once any abnormal situation is found, please promptly troubleshoot. Forced operation will inevitably cause damage to the unit.



Precautions for operation:


1. Before starting up, check whether all water outlets and pipelines of the unit have been correctly installed and connected.

2. Before starting up, check if the power supply of the unit is connected and if the phase sequence is correct.

3. Before starting up, ensure the safety of the power and water sources. Please carefully refer to the equipment operation manual and strictly follow the instructions for use and operation.



Maintenance precautions:


1. Regularly replace the water in the water tank (it is recommended to replace it every 2 months).

2. Regularly clean the radiator of the unit. For air-cooled units, it is recommended to clean the radiator every 3 months; It is recommended to clean the shell and tube condenser and cooling tower of water-cooled units every 6 months (if the usage environment or water quality is poor, it is recommended to shorten the cleaning cycle).

3. If the unit is not used for a long time, please turn off the main power supply; When the ambient temperature is below 0 ℃ and the unit is shut down for more than 6 hours, the unit and pipelines may freeze, and the damage caused by this is not covered by the warranty. The best way to avoid pipeline freezing is to completely drain all the water in the unit system!

4. Regularly check the water quality on site to ensure that the water source is qualified (pH ≈ 7). If it contains corrosive substances and causes damage to the unit, it is not covered by the warranty.

5. When the unit encounters unavoidable faults during use, please inform our company of the unit model, component name, and other information so that we can provide you with services more quickly.

6. During the warranty period, our company promises to provide free maintenance services for the unit (excluding human damage, improper use, natural disasters, and uncontrollable factors).

Warning: This unit is a high-voltage, highly specialized mechanical equipment, and should be operated correctly by professional technicians strictly in accordance with the "User and Installation Manual".